Coronavirus (COVID-19) update: Complete our 2-minute survey and tell us what information you need to help your business during COVID-19. Find assistance and support for coronavirus affected businesses and industries.

Current location of water allocations in the Endeavour Water Management Area

Annual Volumetric Limits as at COB 07 August 2020

Unsupplemented

A change to the location of a water allocation is possible between zones.

If the change can be made within the constraints set by the trading rules, then the change will generally be approved.

Endeavour Water Management Area- Water allocation group Class 1
Zone Maximum Annual Volumetric Limit* Projected Annual Volumetric Limit* Trade into zone permitted?
Endeavour Zone A 0 0.00 No
Endeavour Zone B 0 0.00 No
Endeavour Zone C 100 0.00 Yes
Endeavour Zone D 1,710 1,618.00 Yes
Endeavour Zone E 800 425.00 Yes

* Volume in Megalitres

Endeavour Water Management Area- Water allocation group Class 2
Zone Maximum Annual Volumetric Limit* Projected Annual Volumetric Limit* Trade into zone permitted?
Endeavour Zone A 700 313.00 Yes
Endeavour Zone B 1,600 1,238.00 Yes
Endeavour Zone C 400 60.00 Yes
Endeavour Zone D 0 0.00 No
Endeavour Zone E 0 0.00 No

* Volume in Megalitres

Projected volume represents the forecasted “current volume” assuming all outstanding dealing certificates or applications under assessment will be registered on the water allocations register. This is also referred to as the “annual volumetric limit”.

Contact

Coronavirus (COVID-19) business support: 1300 654 687

General enquiries: 13 QGOV (13 74 68)