Current location of water allocations in the Pioneer River Water Supply Scheme

A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules then the change will generally be approved.

HIGH CLASS A priority water allocations (ML)
Pioneer River Water Supply Scheme Nominal Volumes as at COB 28th Mar 2024
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Zone Cattle Creek 1 0 0 90 5,000 480 90
Zone Cattle Creek 2 0 0 310 0
Zone Pioneer 3 0 700 4,500 700
Zone Pioneer 4 0 0 250 0
Zone Silver Mcgregor 1 0 0 0 0
Zone Teemburra 1 0 8 475 8
Zone Bakers Creek 1 26,500 0 0 31,000 0 0
Zone Pioneer 1 18,000 18,100 30,400 18,100
Zone Pioneer 2 500 11,855 12,600 11,855

All values in Megalitres

* This represents the forecasted “current volume” assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

A combined maximum or minimum volume for two or more zones means the total current volume for all those zones, when added together, must not breach that maximum or minimum figure. For example, if two zones have a combined maximum volume of 1,000ML then the current volume of both zones must always be at or below 1,000ML.

Some zones will also have individually specified maximum or minimum volumes as well as a combined maximum or minimum volume. For example, if Zone 1 and Zone 2 specify a maximum volume of 800ML and 950ML respectively, then the current volume for each zone must not exceed the volume specified for the zone value. If both these zones also have a combined maximum volume of 1,500ML then the current volume of both zones combined must not exceed 1,500ML.

HIGH CLASS B priority water allocations (ML)
Pioneer River Water Supply Scheme Nominal Volumes as at COB 28th Mar 2024
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Zone Cattle Creek 1 26,250 1,750 7,683 33,750 8,800 7,683
Zone Cattle Creek 2 0 2,824 4,300 2,824
Zone Pioneer 3 850 4,439 11,500 4,439
Zone Pioneer 4 50 2,780 4,400 2,780
Zone Silver Mcgregor 1 2,000 4,537 6,000 4,537
Zone Teemburra 1 500 4,886 6,100 4,886
Zone Bakers Creek 1 13,150 3,000 4,726 20,650 6,000 4,726
Zone Pioneer 1 0 7,510 17,700 7,510
Zone Pioneer 2 0 7,972 14,700 7,972

All values in Megalitres

* This represents the forecasted “current volume” assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

A combined maximum or minimum volume for two or more zones means the total current volume for all those zones, when added together, must not breach that maximum or minimum figure. For example, if two zones have a combined maximum volume of 1,000ML then the current volume of both zones must always be at or below 1,000ML.

Some zones will also have individually specified maximum or minimum volumes as well as a combined maximum or minimum volume. For example, if Zone 1 and Zone 2 specify a maximum volume of 800ML and 950ML respectively, then the current volume for each zone must not exceed the volume specified for the zone value. If both these zones also have a combined maximum volume of 1,500ML then the current volume of both zones combined must not exceed 1,500ML.