Current location of water allocations in the Haughton water management area

A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules then the change will generally be approved.

Annual Volumetric Limits as at COB 9 November 2026

Unsupplemented
Haughton Water Management Area- All Water Allocations in Group B1
Zone Maximum Annual Volumetric Limit* Projected Annual Volumetric Limit* Trade into zone permitted?
Haughton Zone A 1,564 1,564 No

* Volume in Megalitres

Projected volume represents the forecasted "current volume" assuming all outstanding dealing certificates or applications under assessment will be registered on the water allocations register. This is also referred to as the "annual volumetric limit".