Current location of water allocations in the Logan River Water Supply Scheme

A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules then the change will generally be approved.

HIGH priority water allocations (ML)
LOGAN R WATER SUPPLY SCHEME Nominal Volumes as at COB 24th Apr 2024
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Burnett Zone A 0 310 340 310
Burnett Zone B 0 0 35 0
Logan Zone A 0 86 120 86
Logan Zone B 0 0 35 0
Logan Zone C 0 470 610 470
Logan Zone D 0 3,765 5,150 3,765
Logan Zone E 0 10 1,400 10
Logan Zone F 0 0 35 0
Logan Zone G 12,100 42,215 19,856 52215 +

All values in Megalitres

* This represents the forecasted “current volume” assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

A combined maximum or minimum volume for two or more zones means the total current volume for all those zones, when added together, must not breach that maximum or minimum figure. For example, if two zones have a combined maximum volume of 1,000ML then the current volume of both zones must always be at or below 1,000ML.

Some zones will also have individually specified maximum or minimum volumes as well as a combined maximum or minimum volume. For example, if Zone 1 and Zone 2 specify a maximum volume of 800ML and 950ML respectively, then the current volume for each zone must not exceed the volume specified for the zone value. If both these zones also have a combined maximum volume of 1,500ML then the current volume of both zones combined must not exceed 1,500ML.

+ This projected volume includes 10,000 megalitres in this zone currently held in reserve for the South East Queensland Water Grid Manager and yet to be recorded on the register.

MEDIUM priority water allocations (ML)
LOGAN R WATER SUPPLY SCHEME Nominal Volumes as at COB 24th Apr 2024
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Burnett Zone A 10 52 390 52
Burnett Zone B 500 1,549 2,000 1,549
Logan Zone A 90 333 650 333
Logan Zone B 1,030 3,318 4,800 3,318
Logan Zone C 625 1,568 3,500 1,568
Logan Zone D 450 1,495 3,000 1,495
Logan Zone E 1,000 4,360 4,700 4,360
Logan Zone F 65 65 350 65
Logan Zone G 300 219 10,000 219

All values in Megalitres

* This represents the forecasted “current volume” assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

A combined maximum or minimum volume for two or more zones means the total current volume for all those zones, when added together, must not breach that maximum or minimum figure. For example, if two zones have a combined maximum volume of 1,000ML then the current volume of both zones must always be at or below 1,000ML.

Some zones will also have individually specified maximum or minimum volumes as well as a combined maximum or minimum volume. For example, if Zone 1 and Zone 2 specify a maximum volume of 800ML and 950ML respectively, then the current volume for each zone must not exceed the volume specified for the zone value. If both these zones also have a combined maximum volume of 1,500ML then the current volume of both zones combined must not exceed 1,500ML.