COVID-19 alert: Read about eased restrictions for businesses in Greater Brisbane from 1am, Friday 22 January.
Guidelines for operating plant
This information has been prepared to help you meet your safety obligations. You should also read about safety requirements and standards in the petroleum and gas industry.
Biogas
LPG delivery network operations
- Safety management system for gas supply and cylinder distribution business template (DOCX, 411KB)
- Guideline for operating plant – LPG delivery networks (PDF, 204KB)
- Fee and reporting requirements for LPG delivery network operators (PDF, 378KB)
- Application for approval to decant LP gas in a residential area LPG (PDF, 86KB)
Operating plant (general)
- Guideline for reporting prescribed incidents (PDF, 142KB)
- Guide to design registration requirements for high-risk pressure equipment (PDF, 140KB)
- Code of practice for leak management, detection and reporting for petroleum operating plant (PDF, 289KB)
- Guideline for the supply of unodourised gas (PDF, 241KB)
Petroleum and drilling operations
- Queensland petroleum well regulation three year plan FY2020/21 to FY2022/23 (PDF, 1.25MB)
- Surface gas handling system and mud gas separator design – principles for drilling operations (PDF, 870KB)
- Surface gas handling system and mud gas separator design – information sheet (PDF, 536KB)
- Code of practice for the construction and abandonment of petroleum wells and associated bores in Queensland (PDF, 999KB)
Theatrical or other special effects
- Last reviewed: 1 Jul 2020
- Last updated: 20 Jan 2021
I want to...
Contact
- Call 000 for emergencies
- Notify prescribed incidents
- Contact the Petroleum and Gas Inspectorate